Eco **Wind & Solar Installation Contractor Roadmap (Korea)** **한국 풍력·태양광 시공업자 로드맵**
Page Info
Writer Joshuaa
Hit 427 Hits
Date 26-01-10 12:04
Content
**Wind & Solar Installation Contractor Roadmap (Korea)**
**한국 풍력·태양광 시공업자 로드맵**
---
## English — How to Become a Wind/Solar Installation Contractor (Korea)
### 1) First, define “installer” precisely (job scope & liability)
In Korea, “installing” a solar PV (and most wind systems) is not just mounting hardware. In practice it bundles multiple regulated scopes:
* **Electrical works**: DC string wiring, combiner boxes, inverters, AC interconnection, grounding, protection devices, switchgear.
* **Structural/civil works**: racking, anchors, roof penetrations/waterproofing, foundations (ground-mount), access roads (wind), crane operations (wind).
* **Permitting + grid interconnection**: local approvals, documentation, inspections, commissioning.
* **Safety & compliance**: electrical code compliance, inspections, documentation retention, warranty obligations.
A critical reality: **PV plant construction contracting is generally restricted to registered electrical construction businesses**; contracting without proper registration can trigger criminal penalties. ([Recloud][1])
---
### 2) Two mainstream career paths (pick one early)
**Path A — Employment → mastery → independent**
* Join an EPC/installer/O&M company.
* Accumulate site experience (rooftop + ground-mount + commercial).
* Build vendor network (modules/inverters/racking), learn paperwork flow, then spin out.
**Path B — Start as a subcontractor under a licensed prime**
* You operate as a crew (mechanical mounting, cable routing, etc.) while the **licensed electrical contractor** remains responsible for regulated electrical contracting and final documentation.
* This is the fastest way to learn, but your revenue is margin-limited until you can legally prime-contract.
---
### 3) The “license + qualification” stack that actually matters in Korea
#### (1) National technical qualifications (great for credibility and hiring)
Korea has national qualifications for renewable power equipment, including:
* **New and Renewable Energy Equipment Engineer (Photovoltaic)** ([Q-Net][2])
* **New and Renewable Energy Equipment Craftman (Photovoltaic)** ([Q-Net][3])
These help you signal competence in PV planning/design/construction/O&M knowledge and are useful for recruiting, bidding, and internal capability building.
Also, track national exam schedules on Q-Net. ([Q-Net][4])
#### (2) Electrical construction business registration (the gating factor for prime contracting)
To **prime-contract** most PV construction work, you generally need to be a properly registered electrical construction business (“전기공사업”). The enforcement basis is in the Electric Construction Business Act framework and its Enforcement Decree, which specifies **registration standards** (technical capability, capital, office, etc.). ([법제처][5])
Additionally, Korea Energy-related guidance explicitly warns that **PV project contracting must be done by a registered electrical construction business**, and illegal contracting may be punished. ([Recloud][1])
**Practical implication**: if your goal is to be the company that signs contracts, issues invoices, and owns commissioning responsibility, you plan around **전기공사업 registration**.
---
### 4) Mandatory inspection & commissioning reality (you must design your process around it)
After installation/alteration of electrical facilities, Korea uses **pre-use inspection (“사용전검사”)** to verify compliance with technical standards; this is handled through KESCO’s process. ([safety.kesco.or.kr][6])
For solar PV, KESCO also publishes detailed guidance (e.g., DC overcurrent protection, DC cable rating selection, bifacial module inspection approach, fencing 기준 under KEC, rooftop PV handling, floating PV salt-spray evidence, BIPV safety performance documents). Treat these as “things that fail inspections if ignored.” ([kes.go.kr][7])
---
### 5) Skill map (what you must be able to do to survive in the market)
#### A. Design & engineering literacy (even if you outsource stamps)
* Site survey, shading/azimuth/tilt constraints, string sizing logic (conceptual), inverter selection logic, cable routing concept, grounding concept.
* Rooftop structural constraints and waterproofing risk control.
* Documentation: single-line diagrams, equipment lists, as-built package.
#### B. Construction execution (site discipline)
* Crew safety: fall protection, lockout/tagout concepts, arc/fire prevention, lifting plans (especially wind), roof work protocols.
* Quality control: torque management, connector mating discipline, cable management, labeling, water ingress prevention.
#### C. O&M (recurring revenue engine)
* Monitoring setup, alarm triage, IV curve/thermal scan concepts (vendor-supported), cleaning schedules, inverter firmware maintenance windows.
* Warranty claim handling: evidence capture, serial tracking, failure taxonomy.
---
### 6) Business model choices (how installers actually make money)
1. **Residential rooftop**: fast sales cycle, smaller tickets, high customer service load.
2. **Commercial/industrial rooftop**: fewer deals, larger tickets, requires better compliance + safety.
3. **Ground-mount (100 kW–MW)**: paperwork-heavy, grid and permitting complexity, but scalable.
4. **O&M contracts**: predictable recurring revenue; often the difference between surviving and failing.
5. **Wind**: fewer projects, heavier civil/crane logistics, stricter siting/noise/environment constraints; higher barrier, sometimes higher margins.
---
### 7) Your “first 90 days” blueprint (actionable sequence)
1. **Learn the compliance flow**: contracting restrictions + registration standards + inspection flow. ([Recloud][1])
2. **Get PV-specific credentials (at least Craftman; ideally Engineer if you meet eligibility)**. ([Q-Net][3])
3. **Join 5–10 live sites** (as employee or subcontractor) and document:
* Typical BOM by project type
* Common inspection failure points (DC protection, cable ratings, rooftop specifics, etc.) ([kes.go.kr][7])
4. **Build supplier list** (modules/inverters/racking/fasteners/cable/labels) and define 2-tier alternatives.
5. **Write internal SOPs**:
* Site safety checklist
* Installation QC checklist
* As-built documentation checklist
* Commissioning checklist aligned to inspection expectations ([kes.go.kr][7])
---
### 8) Non-negotiable safety note
Wind/solar installation combines **heights + electricity + heavy lifting**. Serious injury and fire risk exist. Your career durability depends on standardized safety practice, documented procedures, and operating only within the legal/inspection framework. ([safety.kesco.or.kr][6])
---
## 한국어 — 풍력·태양광 시공업자가 되는 방법(한국 기준)
### 1) “설치업자”의 의미부터 확정해야 함(업무범위=책임범위)
한국에서 태양광/풍력 “설치”는 단순 시공팀이 아니라, 보통 아래를 모두 포함합니다.
* **전기공사 영역**: 태양광 DC 스트링/접속함/인버터, AC 연계, 접지, 보호장치, 차단·개폐기류
* **구조·토목 영역**: 랙/앵커/기초, 지붕 관통부 방수, (풍력은) 기초·도로·크레인/양중
* **인허가·계통연계·준공 서류**
* **검사·시운전·하자·A/S**
특히 핵심 포인트: **태양광 발전사업 도급(계약) 자체가 전기공사업 등록업체가 아니면 제한**된다는 경고/안내가 명시되어 있고, 위반 시 처벌 리스크가 큽니다. ([Recloud][1])
---
### 2) 현실적인 진입 루트 2가지(초기에 선택하면 비용이 줄어듦)
**루트 A — 취업 → 현장 숙련 → 독립**
* EPC/시공사/O&M 회사에서 현장 경험 축적
* 지붕형/지상형/상업용 등 유형별 “흐름”을 익힌 뒤 창업
**루트 B — 등록업체(전기공사업) 아래에서 협력·하도급으로 시작**
* 본인은 **기계적 설치(랙/모듈/케이블 트레이 등)** 중심으로 시작하고,
* **법적 책임이 큰 전기 도급·검사·서류는 등록된 전기공사업체**가 맡는 구조
* 학습 속도는 빠르나, “원도급” 마진은 제한됨(등록 전까지는 구조적으로 그럴 수밖에 없음)
---
### 3) 자격·면허(등록) 구조: “시험 합격”과 “도급 가능”은 다름
#### (1) 국가기술자격: 태양광 전문성의 표준 스펙
* **신재생에너지발전설비기사(태양광)** ([Q-Net][2])
* **신재생에너지발전설비기능사(태양광)** ([Q-Net][3])
이 자격은 채용·입찰·대외 신뢰에 직접 도움이 됩니다. 시험 일정은 Q-Net 연간 일정에서 확인합니다. ([Q-Net][4])
#### (2) 전기공사업 등록: “태양광을 업으로 도급”하려면 사실상 관문
태양광 발전사업은 전기설비 공사와 결합되기 때문에, **전기공사업 등록 요건**을 충족해 “등록업체”가 되는 것이 원도급의 핵심 관문입니다. 등록기준(기술능력·자본금·사무실 등)은 **전기공사업법 시행령**에서 규정합니다. ([법제처][5])
또한 관련 안내에서는 “태양광 발전사업 도급계약은 전기공사업 등록업체가 아니면 할 수 없다”는 취지로 불법 도급 시 처벌 가능성을 명시합니다. ([Recloud][1])
정리하면:
* **자격증(기사/기능사)** = 실력/신뢰/채용·입찰 가점
* **전기공사업 등록** = (대부분 케이스에서) “도급 계약을 내가 주도”하기 위한 법적 기반
---
### 4) 사용전검사(검사·준공)까지 역산해서 프로세스를 짜야 함
태양광/풍력 설비는 설치 후 끝이 아니라, 전기설비가 기준에 맞는지 확인하는 **사용전검사(사용 전 검사)** 단계가 사실상 “완성의 관문”입니다. 사용전검사 안내(법적 근거/서류/절차)는 한국전기안전공사(KESCO) 흐름으로 운영됩니다. ([safety.kesco.or.kr][6])
태양광은 특히 한국전기안전공사가 **검사업무처리방법(DC 과전류보호, DC 케이블 정격선정, 양면형 모듈 검사, 울타리 기준(KEC), 지붕형 태양광, 수상태양광 염수분무 성적서, BIPV 안전성능성적서 등)** 같은 “실무에서 탈락 포인트가 되는 항목”을 구체적으로 안내합니다. ([kes.go.kr][7])
즉, 시장에서 돈을 버는 설치업자는:
* 시공을 “예쁘게”가 아니라
* **검사에서 통과되는 방식으로** 표준화합니다.
---
### 5) 실무 역량 로드맵(현장에서 바로 차이가 나는 능력)
#### A. 설계·엔지니어링 문해력(도장/설계 외주를 쓰더라도 필수)
* 현장조사(그림자/방향/각도/제약), 스트링 구성 논리(개념 수준), 인버터 선정 논리
* 지붕 구조·방수 리스크 관리(누수는 바로 클레임/평판 하락)
* 도면·자재명세·준공(as-built) 패키지 구성
#### B. 시공 품질(QC) 표준화
* 토크 관리(체결), 커넥터 결선 품질, 케이블 정리/라벨링
* 관통부 방수, 접지·보호장치의 “기준 충족” 관점 체크
* 준공도면과 실제 시공의 일치(검사/하자에서 큰 차이를 만듦)
#### C. O&M(유지보수) 역량 = 장기 생존
* 모니터링·알람 대응, 고장 분류, 인버터 유지관리, 청소/점검 루틴
* A/S·보증 클레임: 증빙(사진/로그/시리얼) 중심으로 처리 체계화
---
### 6) 수익모델(설치업이 “시공만”으로는 불안정한 이유)
* **주택용 지붕형**: 영업은 빠르지만 CS가 많음
* **상업용/공장 지붕형**: 건당 규모↑, 안전·서류·책임↑
* **지상형(수백 kW~MW)**: 인허가·계통·서류가 무겁지만 확장성↑
* **O&M 계약**: 반복 매출(설치업자의 생존율을 크게 올림)
* **풍력**: 입지·소음·환경·인허가·양중 난이도↑, 진입장벽↑(대신 프로젝트당 단가 구조가 달라질 여지)
---
### 7) “처음 90일” 실행 순서(실전형)
1. **도급 제한/등록기준/검사흐름**을 먼저 학습(법·현실을 먼저 알아야 시행착오가 줄어듦). ([Recloud][1])
2. 기능사 → 기사(가능하면)로 “태양광 스펙”을 확보. ([Q-Net][3])
3. 최소 5~10개 현장에 참여해서 “검사에서 떨어지는 포인트”를 수집:
* DC 과전류보호/케이블 정격/지붕형 처리/BIPV 서류 등 ([kes.go.kr][7])
4. 공급망 구축(모듈/인버터/랙/부자재/케이블) + 대체벤더 2순위까지 준비
5. 사내 표준서(SOP) 4종 작성:
* 안전 체크리스트 / 시공 QC / 준공서류 / 시운전·검사 대응
---
### 8) 안전(현장 사고 한 번이 사업을 끝낼 수 있음)
풍력·태양광은 **고소작업 + 전기 + 양중**이 결합됩니다. 그래서 “개인의 숙련”보다 **표준 절차·점검표·문서화**가 더 중요해집니다. 특히 사용전검사 기준과 태양광 검사업무처리방법 같은 문서를 “시공 품질의 기준선”으로 삼는 게 사업 지속성에 직결됩니다. ([safety.kesco.or.kr][6])
---
## 日本語 — 風力・太陽光の施工業者になる(韓国を前提)
### 1) 施工=取付だけではなく「電気工事+検査+書類」まで
韓国では、太陽光・風力の“施工”は、架台や機器の固定に加えて **電気設備としての工事・系統連系・検査対応**が不可分です。太陽光の工事受注(請負)は、登録された電気工事業でないと制限され得て、違反時の処罰リスクも明示されています。 ([Recloud][1])
### 2) 現実的な参入ルート
* **就職→現場経験→独立**(EPC/施工会社/O&Mで型を学ぶ)
* **登録業者の下で協力会社として開始**(機械取付中心、法的責任の重い電気請負は登録業者側)
### 3) 資格(技能)と登録(請負の可否)は別
* 太陽光の国家資格:**新再生エネルギー発電設備 技師(太陽光)**、**技能士(太陽光)** ([Q-Net][2])
* しかし“元請”として契約するには、実務上 **電気工事業の登録基準**(技術能力・資本・事務所など)を満たす設計が必要です。 ([법제처][5])
### 4) 使用前検査(使用前検査)から逆算して施工プロセスを作る
電気設備は工事完了後、基準適合を確認する **使用前検査**が運用されています。 ([safety.kesco.or.kr][6])
太陽光は、DC過電流保護、DCケーブル定格、屋根置き、BIPV資料など、検査で重要になる論点が詳細に示されています。 ([kes.go.kr][7])
### 5) 収益モデル(施工だけでなくO&Mが鍵)
住宅屋根、工場屋根、地上設置(100kW〜MW)、そして **O&M(保守)契約**で継続収益を作るのが定石です。風力は土木・揚重・立地規制が重く参入障壁が高い分、プロジェクト型になります。
---
## Español — Convertirse en instalador/contratista de eólica y solar (Corea)
### 1) Qué significa “instalar” en la práctica
En Corea, instalar solar/eólica normalmente implica **obra eléctrica + estructura/civil + permisos + inspección + puesta en marcha**. Para solar FV, se advierte que el **contrato de obra (contratación)** suele estar limitado a empresas registradas de obra eléctrica; contratar sin registro puede conllevar sanciones. ([Recloud][1])
### 2) Rutas de entrada más realistas
* **Empleado → experiencia en obra → independencia**
* **Subcontratista bajo una empresa registrada**, mientras aprendes flujo de documentación e inspecciones
### 3) Credenciales útiles (solar) y la barrera real (registro)
* Certificaciones nacionales FV: **Engineer (Photovoltaic)** y **Craftman (Photovoltaic)** ([Q-Net][2])
* Para firmar contratos como principal, necesitas planificar el **registro del negocio de obra eléctrica**, con criterios definidos en el decreto de aplicación (capacidad técnica, capital, oficina, etc.). ([법제처][5])
### 4) Inspección previa al uso (clave operativa)
La **inspección previa al uso** verifica que la instalación eléctrica cumple los estándares; el flujo se gestiona mediante KESCO. ([safety.kesco.or.kr][6])
En FV, hay guías prácticas (protecciones DC, selección de cable DC, consideraciones para tejados, BIPV, etc.) que conviene tratar como lista de verificación de calidad. ([kes.go.kr][7])
### 5) Modelo de negocio
No dependas solo de “instalar”: añade **O&M (operación y mantenimiento)** para ingresos recurrentes. La eólica tiene mayor barrera (obra civil, grúas, restricciones ambientales/ruido), por lo que suele ser más “por proyecto”.
---
## Français — Devenir installateur/entreprise d’installation éolien + solaire (Corée)
### 1) Le métier réel : électricité + structure + conformité + dossiers
En Corée, l’installation solaire/éolienne inclut généralement **travaux électriques, montage structurel, démarches administratives, inspection et mise en service**. Pour le solaire, il est explicitement indiqué que la **passation de marché/contrat de travaux** doit être réalisée par une entreprise enregistrée de travaux électriques, avec un risque de sanction en cas d’illégalité. ([Recloud][1])
### 2) Stratégies d’entrée
* **Salariat → expérience terrain → création d’entreprise**
* **Sous-traitance** sous une entreprise enregistrée (apprentissage rapide, risque juridique réduit)
### 3) Certifications (solaire) vs capacité à contracter
* Qualifications nationales : **Engineer (Photovoltaic)** / **Craftman (Photovoltaic)** ([Q-Net][2])
* Pour contracter en tant que donneur d’ordre, il faut structurer l’entreprise autour des **critères d’enregistrement** (capacité technique, capital, bureau, etc.) prévus par le décret d’application. ([법제처][5])
### 4) Inspection “avant mise en service” : le point de passage obligatoire
L’**inspection avant mise en service** confirme la conformité aux standards techniques. ([safety.kesco.or.kr][6])
Pour le photovoltaïque, des consignes détaillées existent (protection surintensité DC, choix des câbles DC, gestion des installations en toiture, exigences BIPV, etc.). ([kes.go.kr][7])
### 5) Viabilité économique
Le levier de stabilité est souvent **l’O&M (exploitation/maintenance)**, car la marge “installation seule” est cyclique. L’éolien présente une barrière plus élevée (génie civil, levage, contraintes d’implantation), donc un modèle davantage orienté projets.
---
[1]: https://recloud.energy.or.kr/damage/sub8_3.do?utm_source=chatgpt.com "관련 법률안내"
[2]: https://www.q-net.or.kr/crf005.do?gId=&gSite=Q&gbnn=gbnSubtab2&id=crf00503&jmCd=1114&jmInfoDivCcd=B0&utm_source=chatgpt.com "신재생에너지발전설비기사(태양광) - 국가자격 종목별 상세 ..."
[3]: https://www.q-net.or.kr/crf005.do?id=crf00503&jmCd=7114&utm_source=chatgpt.com "신재생에너지발전설비기능사(태양광) - 국가자격 종목별 ..."
[4]: https://www.q-net.or.kr/crf021.do?id=crf02101&scheType=03&utm_source=chatgpt.com "기사/산업기사 시험일정"
[5]: https://www.law.go.kr/LSW/lsInfoP.do?lsiSeq=95363&utm_source=chatgpt.com "전기공사업법 시행령"
[6]: https://safety.kesco.or.kr/cyber/cr/ubi/moveUseBfeInspctStep01.do?utm_source=chatgpt.com "전기안전여기로>사용전검사"
[7]: https://www.kes.go.kr/web/lay1/bbs/S1T157C159/A/1/view.do?article_seq=1022&condition=&cpage=&keyword=&mode=view&rows=&utm_source=chatgpt.com "태양광발전설비 검사업무처리방법 안내"
**한국 풍력·태양광 시공업자 로드맵**
---
## English — How to Become a Wind/Solar Installation Contractor (Korea)
### 1) First, define “installer” precisely (job scope & liability)
In Korea, “installing” a solar PV (and most wind systems) is not just mounting hardware. In practice it bundles multiple regulated scopes:
* **Electrical works**: DC string wiring, combiner boxes, inverters, AC interconnection, grounding, protection devices, switchgear.
* **Structural/civil works**: racking, anchors, roof penetrations/waterproofing, foundations (ground-mount), access roads (wind), crane operations (wind).
* **Permitting + grid interconnection**: local approvals, documentation, inspections, commissioning.
* **Safety & compliance**: electrical code compliance, inspections, documentation retention, warranty obligations.
A critical reality: **PV plant construction contracting is generally restricted to registered electrical construction businesses**; contracting without proper registration can trigger criminal penalties. ([Recloud][1])
---
### 2) Two mainstream career paths (pick one early)
**Path A — Employment → mastery → independent**
* Join an EPC/installer/O&M company.
* Accumulate site experience (rooftop + ground-mount + commercial).
* Build vendor network (modules/inverters/racking), learn paperwork flow, then spin out.
**Path B — Start as a subcontractor under a licensed prime**
* You operate as a crew (mechanical mounting, cable routing, etc.) while the **licensed electrical contractor** remains responsible for regulated electrical contracting and final documentation.
* This is the fastest way to learn, but your revenue is margin-limited until you can legally prime-contract.
---
### 3) The “license + qualification” stack that actually matters in Korea
#### (1) National technical qualifications (great for credibility and hiring)
Korea has national qualifications for renewable power equipment, including:
* **New and Renewable Energy Equipment Engineer (Photovoltaic)** ([Q-Net][2])
* **New and Renewable Energy Equipment Craftman (Photovoltaic)** ([Q-Net][3])
These help you signal competence in PV planning/design/construction/O&M knowledge and are useful for recruiting, bidding, and internal capability building.
Also, track national exam schedules on Q-Net. ([Q-Net][4])
#### (2) Electrical construction business registration (the gating factor for prime contracting)
To **prime-contract** most PV construction work, you generally need to be a properly registered electrical construction business (“전기공사업”). The enforcement basis is in the Electric Construction Business Act framework and its Enforcement Decree, which specifies **registration standards** (technical capability, capital, office, etc.). ([법제처][5])
Additionally, Korea Energy-related guidance explicitly warns that **PV project contracting must be done by a registered electrical construction business**, and illegal contracting may be punished. ([Recloud][1])
**Practical implication**: if your goal is to be the company that signs contracts, issues invoices, and owns commissioning responsibility, you plan around **전기공사업 registration**.
---
### 4) Mandatory inspection & commissioning reality (you must design your process around it)
After installation/alteration of electrical facilities, Korea uses **pre-use inspection (“사용전검사”)** to verify compliance with technical standards; this is handled through KESCO’s process. ([safety.kesco.or.kr][6])
For solar PV, KESCO also publishes detailed guidance (e.g., DC overcurrent protection, DC cable rating selection, bifacial module inspection approach, fencing 기준 under KEC, rooftop PV handling, floating PV salt-spray evidence, BIPV safety performance documents). Treat these as “things that fail inspections if ignored.” ([kes.go.kr][7])
---
### 5) Skill map (what you must be able to do to survive in the market)
#### A. Design & engineering literacy (even if you outsource stamps)
* Site survey, shading/azimuth/tilt constraints, string sizing logic (conceptual), inverter selection logic, cable routing concept, grounding concept.
* Rooftop structural constraints and waterproofing risk control.
* Documentation: single-line diagrams, equipment lists, as-built package.
#### B. Construction execution (site discipline)
* Crew safety: fall protection, lockout/tagout concepts, arc/fire prevention, lifting plans (especially wind), roof work protocols.
* Quality control: torque management, connector mating discipline, cable management, labeling, water ingress prevention.
#### C. O&M (recurring revenue engine)
* Monitoring setup, alarm triage, IV curve/thermal scan concepts (vendor-supported), cleaning schedules, inverter firmware maintenance windows.
* Warranty claim handling: evidence capture, serial tracking, failure taxonomy.
---
### 6) Business model choices (how installers actually make money)
1. **Residential rooftop**: fast sales cycle, smaller tickets, high customer service load.
2. **Commercial/industrial rooftop**: fewer deals, larger tickets, requires better compliance + safety.
3. **Ground-mount (100 kW–MW)**: paperwork-heavy, grid and permitting complexity, but scalable.
4. **O&M contracts**: predictable recurring revenue; often the difference between surviving and failing.
5. **Wind**: fewer projects, heavier civil/crane logistics, stricter siting/noise/environment constraints; higher barrier, sometimes higher margins.
---
### 7) Your “first 90 days” blueprint (actionable sequence)
1. **Learn the compliance flow**: contracting restrictions + registration standards + inspection flow. ([Recloud][1])
2. **Get PV-specific credentials (at least Craftman; ideally Engineer if you meet eligibility)**. ([Q-Net][3])
3. **Join 5–10 live sites** (as employee or subcontractor) and document:
* Typical BOM by project type
* Common inspection failure points (DC protection, cable ratings, rooftop specifics, etc.) ([kes.go.kr][7])
4. **Build supplier list** (modules/inverters/racking/fasteners/cable/labels) and define 2-tier alternatives.
5. **Write internal SOPs**:
* Site safety checklist
* Installation QC checklist
* As-built documentation checklist
* Commissioning checklist aligned to inspection expectations ([kes.go.kr][7])
---
### 8) Non-negotiable safety note
Wind/solar installation combines **heights + electricity + heavy lifting**. Serious injury and fire risk exist. Your career durability depends on standardized safety practice, documented procedures, and operating only within the legal/inspection framework. ([safety.kesco.or.kr][6])
---
## 한국어 — 풍력·태양광 시공업자가 되는 방법(한국 기준)
### 1) “설치업자”의 의미부터 확정해야 함(업무범위=책임범위)
한국에서 태양광/풍력 “설치”는 단순 시공팀이 아니라, 보통 아래를 모두 포함합니다.
* **전기공사 영역**: 태양광 DC 스트링/접속함/인버터, AC 연계, 접지, 보호장치, 차단·개폐기류
* **구조·토목 영역**: 랙/앵커/기초, 지붕 관통부 방수, (풍력은) 기초·도로·크레인/양중
* **인허가·계통연계·준공 서류**
* **검사·시운전·하자·A/S**
특히 핵심 포인트: **태양광 발전사업 도급(계약) 자체가 전기공사업 등록업체가 아니면 제한**된다는 경고/안내가 명시되어 있고, 위반 시 처벌 리스크가 큽니다. ([Recloud][1])
---
### 2) 현실적인 진입 루트 2가지(초기에 선택하면 비용이 줄어듦)
**루트 A — 취업 → 현장 숙련 → 독립**
* EPC/시공사/O&M 회사에서 현장 경험 축적
* 지붕형/지상형/상업용 등 유형별 “흐름”을 익힌 뒤 창업
**루트 B — 등록업체(전기공사업) 아래에서 협력·하도급으로 시작**
* 본인은 **기계적 설치(랙/모듈/케이블 트레이 등)** 중심으로 시작하고,
* **법적 책임이 큰 전기 도급·검사·서류는 등록된 전기공사업체**가 맡는 구조
* 학습 속도는 빠르나, “원도급” 마진은 제한됨(등록 전까지는 구조적으로 그럴 수밖에 없음)
---
### 3) 자격·면허(등록) 구조: “시험 합격”과 “도급 가능”은 다름
#### (1) 국가기술자격: 태양광 전문성의 표준 스펙
* **신재생에너지발전설비기사(태양광)** ([Q-Net][2])
* **신재생에너지발전설비기능사(태양광)** ([Q-Net][3])
이 자격은 채용·입찰·대외 신뢰에 직접 도움이 됩니다. 시험 일정은 Q-Net 연간 일정에서 확인합니다. ([Q-Net][4])
#### (2) 전기공사업 등록: “태양광을 업으로 도급”하려면 사실상 관문
태양광 발전사업은 전기설비 공사와 결합되기 때문에, **전기공사업 등록 요건**을 충족해 “등록업체”가 되는 것이 원도급의 핵심 관문입니다. 등록기준(기술능력·자본금·사무실 등)은 **전기공사업법 시행령**에서 규정합니다. ([법제처][5])
또한 관련 안내에서는 “태양광 발전사업 도급계약은 전기공사업 등록업체가 아니면 할 수 없다”는 취지로 불법 도급 시 처벌 가능성을 명시합니다. ([Recloud][1])
정리하면:
* **자격증(기사/기능사)** = 실력/신뢰/채용·입찰 가점
* **전기공사업 등록** = (대부분 케이스에서) “도급 계약을 내가 주도”하기 위한 법적 기반
---
### 4) 사용전검사(검사·준공)까지 역산해서 프로세스를 짜야 함
태양광/풍력 설비는 설치 후 끝이 아니라, 전기설비가 기준에 맞는지 확인하는 **사용전검사(사용 전 검사)** 단계가 사실상 “완성의 관문”입니다. 사용전검사 안내(법적 근거/서류/절차)는 한국전기안전공사(KESCO) 흐름으로 운영됩니다. ([safety.kesco.or.kr][6])
태양광은 특히 한국전기안전공사가 **검사업무처리방법(DC 과전류보호, DC 케이블 정격선정, 양면형 모듈 검사, 울타리 기준(KEC), 지붕형 태양광, 수상태양광 염수분무 성적서, BIPV 안전성능성적서 등)** 같은 “실무에서 탈락 포인트가 되는 항목”을 구체적으로 안내합니다. ([kes.go.kr][7])
즉, 시장에서 돈을 버는 설치업자는:
* 시공을 “예쁘게”가 아니라
* **검사에서 통과되는 방식으로** 표준화합니다.
---
### 5) 실무 역량 로드맵(현장에서 바로 차이가 나는 능력)
#### A. 설계·엔지니어링 문해력(도장/설계 외주를 쓰더라도 필수)
* 현장조사(그림자/방향/각도/제약), 스트링 구성 논리(개념 수준), 인버터 선정 논리
* 지붕 구조·방수 리스크 관리(누수는 바로 클레임/평판 하락)
* 도면·자재명세·준공(as-built) 패키지 구성
#### B. 시공 품질(QC) 표준화
* 토크 관리(체결), 커넥터 결선 품질, 케이블 정리/라벨링
* 관통부 방수, 접지·보호장치의 “기준 충족” 관점 체크
* 준공도면과 실제 시공의 일치(검사/하자에서 큰 차이를 만듦)
#### C. O&M(유지보수) 역량 = 장기 생존
* 모니터링·알람 대응, 고장 분류, 인버터 유지관리, 청소/점검 루틴
* A/S·보증 클레임: 증빙(사진/로그/시리얼) 중심으로 처리 체계화
---
### 6) 수익모델(설치업이 “시공만”으로는 불안정한 이유)
* **주택용 지붕형**: 영업은 빠르지만 CS가 많음
* **상업용/공장 지붕형**: 건당 규모↑, 안전·서류·책임↑
* **지상형(수백 kW~MW)**: 인허가·계통·서류가 무겁지만 확장성↑
* **O&M 계약**: 반복 매출(설치업자의 생존율을 크게 올림)
* **풍력**: 입지·소음·환경·인허가·양중 난이도↑, 진입장벽↑(대신 프로젝트당 단가 구조가 달라질 여지)
---
### 7) “처음 90일” 실행 순서(실전형)
1. **도급 제한/등록기준/검사흐름**을 먼저 학습(법·현실을 먼저 알아야 시행착오가 줄어듦). ([Recloud][1])
2. 기능사 → 기사(가능하면)로 “태양광 스펙”을 확보. ([Q-Net][3])
3. 최소 5~10개 현장에 참여해서 “검사에서 떨어지는 포인트”를 수집:
* DC 과전류보호/케이블 정격/지붕형 처리/BIPV 서류 등 ([kes.go.kr][7])
4. 공급망 구축(모듈/인버터/랙/부자재/케이블) + 대체벤더 2순위까지 준비
5. 사내 표준서(SOP) 4종 작성:
* 안전 체크리스트 / 시공 QC / 준공서류 / 시운전·검사 대응
---
### 8) 안전(현장 사고 한 번이 사업을 끝낼 수 있음)
풍력·태양광은 **고소작업 + 전기 + 양중**이 결합됩니다. 그래서 “개인의 숙련”보다 **표준 절차·점검표·문서화**가 더 중요해집니다. 특히 사용전검사 기준과 태양광 검사업무처리방법 같은 문서를 “시공 품질의 기준선”으로 삼는 게 사업 지속성에 직결됩니다. ([safety.kesco.or.kr][6])
---
## 日本語 — 風力・太陽光の施工業者になる(韓国を前提)
### 1) 施工=取付だけではなく「電気工事+検査+書類」まで
韓国では、太陽光・風力の“施工”は、架台や機器の固定に加えて **電気設備としての工事・系統連系・検査対応**が不可分です。太陽光の工事受注(請負)は、登録された電気工事業でないと制限され得て、違反時の処罰リスクも明示されています。 ([Recloud][1])
### 2) 現実的な参入ルート
* **就職→現場経験→独立**(EPC/施工会社/O&Mで型を学ぶ)
* **登録業者の下で協力会社として開始**(機械取付中心、法的責任の重い電気請負は登録業者側)
### 3) 資格(技能)と登録(請負の可否)は別
* 太陽光の国家資格:**新再生エネルギー発電設備 技師(太陽光)**、**技能士(太陽光)** ([Q-Net][2])
* しかし“元請”として契約するには、実務上 **電気工事業の登録基準**(技術能力・資本・事務所など)を満たす設計が必要です。 ([법제처][5])
### 4) 使用前検査(使用前検査)から逆算して施工プロセスを作る
電気設備は工事完了後、基準適合を確認する **使用前検査**が運用されています。 ([safety.kesco.or.kr][6])
太陽光は、DC過電流保護、DCケーブル定格、屋根置き、BIPV資料など、検査で重要になる論点が詳細に示されています。 ([kes.go.kr][7])
### 5) 収益モデル(施工だけでなくO&Mが鍵)
住宅屋根、工場屋根、地上設置(100kW〜MW)、そして **O&M(保守)契約**で継続収益を作るのが定石です。風力は土木・揚重・立地規制が重く参入障壁が高い分、プロジェクト型になります。
---
## Español — Convertirse en instalador/contratista de eólica y solar (Corea)
### 1) Qué significa “instalar” en la práctica
En Corea, instalar solar/eólica normalmente implica **obra eléctrica + estructura/civil + permisos + inspección + puesta en marcha**. Para solar FV, se advierte que el **contrato de obra (contratación)** suele estar limitado a empresas registradas de obra eléctrica; contratar sin registro puede conllevar sanciones. ([Recloud][1])
### 2) Rutas de entrada más realistas
* **Empleado → experiencia en obra → independencia**
* **Subcontratista bajo una empresa registrada**, mientras aprendes flujo de documentación e inspecciones
### 3) Credenciales útiles (solar) y la barrera real (registro)
* Certificaciones nacionales FV: **Engineer (Photovoltaic)** y **Craftman (Photovoltaic)** ([Q-Net][2])
* Para firmar contratos como principal, necesitas planificar el **registro del negocio de obra eléctrica**, con criterios definidos en el decreto de aplicación (capacidad técnica, capital, oficina, etc.). ([법제처][5])
### 4) Inspección previa al uso (clave operativa)
La **inspección previa al uso** verifica que la instalación eléctrica cumple los estándares; el flujo se gestiona mediante KESCO. ([safety.kesco.or.kr][6])
En FV, hay guías prácticas (protecciones DC, selección de cable DC, consideraciones para tejados, BIPV, etc.) que conviene tratar como lista de verificación de calidad. ([kes.go.kr][7])
### 5) Modelo de negocio
No dependas solo de “instalar”: añade **O&M (operación y mantenimiento)** para ingresos recurrentes. La eólica tiene mayor barrera (obra civil, grúas, restricciones ambientales/ruido), por lo que suele ser más “por proyecto”.
---
## Français — Devenir installateur/entreprise d’installation éolien + solaire (Corée)
### 1) Le métier réel : électricité + structure + conformité + dossiers
En Corée, l’installation solaire/éolienne inclut généralement **travaux électriques, montage structurel, démarches administratives, inspection et mise en service**. Pour le solaire, il est explicitement indiqué que la **passation de marché/contrat de travaux** doit être réalisée par une entreprise enregistrée de travaux électriques, avec un risque de sanction en cas d’illégalité. ([Recloud][1])
### 2) Stratégies d’entrée
* **Salariat → expérience terrain → création d’entreprise**
* **Sous-traitance** sous une entreprise enregistrée (apprentissage rapide, risque juridique réduit)
### 3) Certifications (solaire) vs capacité à contracter
* Qualifications nationales : **Engineer (Photovoltaic)** / **Craftman (Photovoltaic)** ([Q-Net][2])
* Pour contracter en tant que donneur d’ordre, il faut structurer l’entreprise autour des **critères d’enregistrement** (capacité technique, capital, bureau, etc.) prévus par le décret d’application. ([법제처][5])
### 4) Inspection “avant mise en service” : le point de passage obligatoire
L’**inspection avant mise en service** confirme la conformité aux standards techniques. ([safety.kesco.or.kr][6])
Pour le photovoltaïque, des consignes détaillées existent (protection surintensité DC, choix des câbles DC, gestion des installations en toiture, exigences BIPV, etc.). ([kes.go.kr][7])
### 5) Viabilité économique
Le levier de stabilité est souvent **l’O&M (exploitation/maintenance)**, car la marge “installation seule” est cyclique. L’éolien présente une barrière plus élevée (génie civil, levage, contraintes d’implantation), donc un modèle davantage orienté projets.
---
[1]: https://recloud.energy.or.kr/damage/sub8_3.do?utm_source=chatgpt.com "관련 법률안내"
[2]: https://www.q-net.or.kr/crf005.do?gId=&gSite=Q&gbnn=gbnSubtab2&id=crf00503&jmCd=1114&jmInfoDivCcd=B0&utm_source=chatgpt.com "신재생에너지발전설비기사(태양광) - 국가자격 종목별 상세 ..."
[3]: https://www.q-net.or.kr/crf005.do?id=crf00503&jmCd=7114&utm_source=chatgpt.com "신재생에너지발전설비기능사(태양광) - 국가자격 종목별 ..."
[4]: https://www.q-net.or.kr/crf021.do?id=crf02101&scheType=03&utm_source=chatgpt.com "기사/산업기사 시험일정"
[5]: https://www.law.go.kr/LSW/lsInfoP.do?lsiSeq=95363&utm_source=chatgpt.com "전기공사업법 시행령"
[6]: https://safety.kesco.or.kr/cyber/cr/ubi/moveUseBfeInspctStep01.do?utm_source=chatgpt.com "전기안전여기로>사용전검사"
[7]: https://www.kes.go.kr/web/lay1/bbs/S1T157C159/A/1/view.do?article_seq=1022&condition=&cpage=&keyword=&mode=view&rows=&utm_source=chatgpt.com "태양광발전설비 검사업무처리방법 안내"